2597 Glendale Ave.          Green Bay, WI 54313          920-434-2145

HOME

SCHOOL

Parish Contacts

Parish History

Sacraments

Faith Formation
   Churchtime
   Youth Ministry
   High School
   Sacrament Preparation
   Young Adult
   Adult

Ministries
   Liturgical
   Music
   Parish Life
   Pastoral
   Schedules

Cemetery

  Timeline of St. John the Baptist Parish/School
1849 Log church built under direction of Rev. Father Bonduel, near Duck Creek, 3.5 miles northwest of Fort Howard
1877 Large brick veneer church built on present property -- church entrance on west side
1881 Rev. Edward F. Van Hootegem, Pastor, St. John the Baptist, 1881 - 1892
1888 St. Leo's school built
1889 St. Leo's school dedicated, October 1st, 1889
1894 New pastor's house constructed after fire destroyed the old one
1915 Corner church constructed using stone from Duck Creek quarry
1949 New eight room school built to replace the original school of 1888 (this is now the middle section of the present school)
1957 1894 rectory razed and the present rectory built
1958 Four room addition to the school on the east side built
1958 Twenty room convent constructed to replace the 70 year old structure
1964 Addition to the school on the west side, consisting of five classrooms, cafeteria, kitchen, large meeting room, and a tunnel connecting the church and the school constructed
1975 Basement of corner church converted to a chapel
1988-1989 Centennial year
1989 Rededication of St. John the Baptist School, October 1st, 1989
1995 Dedication of new addition, gym, pre-school, library-media center, and commons
2006-2008 Construction of existing church
2008 Convert old church to Youth Ministry
2009 1957 rectory razed for safety and cost-savings
2009 Construction of rectory for pastor

New church from the east

Current church - view from the east

Copyright © 2011 St. John the Baptist Church
All rights reserved.